Minor hydro-electric plants of Kabardino-Balkaria
・ Minor ice hockey
・ Minor in Possession
・ Minor injuries unit
・ Minor Inscriptions of Kharavela
・ Minor interest (English law)
・ Minor International
・ Minor islands of the United States Virgin Islands
・ Minor league
・ Minor League Baseball
・ Minor League Baseball rosters
・ Minor League Baseball Umpire Training Academy
・ Minor loop feedback
・ Minor Love
・ Minor López


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Minor hydro-electric plants of Kabardino-Balkaria : ウィキペディア英語版
Minor hydro-electric plants of Kabardino-Balkaria

On the territory of Kabardino-Balkaria republic a number of minor hydro-electric plants are located.
Most important of them are the Baksanskaya HEP (on the Baksan River, 25 MW, was completed in 1939), Aushigerskaya HEP (on the Cherek River, 60 MW, was completed in 2002) and the Kashkhatau HEP (which is also on the Cherek River, 65,1 MW, was scheduled for completion in 2008).
All of them are currently owned by the Kabardino-Balkaria subsidiary of the OJSC HydroOGK.
In service:
* MHEP-3 on the Baksan-Malka irrigation channel. Constructed in 1995–2000. Current power output – 3,75 MW. MHEP is scheduled for redevelopment for the power output to be about 10,5 MW.
* Akbashskaya HEP on the Malka-Terek irrigation channel. Constructed in 1928, produced 0,35 MW but later ruined. Reconstructed in 1995 to produce 1,1 MW.
* Mukholskaya HEP on the Cherek Balkarskiy River (near the Verkhnyaya Balkaria settlement). In service since 1962 producing 0,64 MW. Currently in process of reconstruction.
Out of service:
* Sovietskaya MHEP (in service 1959–2008) – 2 MW, 15 mln kWh per year.
* Soldatskaya MHEP – 0,36 MW.
Projected:
* Zaragizhskaya HEP (or Cherekskaya MHEP) – Planned for December 2009, 15–15,6 MW expected.
* Verkhnebalkarskaya HEP – Scheduled for 2009, 14,7–15,6 MW expected.
* Adyr-Su HEP – Expected to start operation in the fall of 2009 or later, 24-24,5 MW approx.
* Kara-Su HEP – Scheduled for completion in 2009, 4,5 MW expected.
* Mukholskaya HEP N2 – Construction dates unknown, 1,78 MW.
* Greta Energy projects includes construction of the cascade of 6 MHEPs – 4 on the Khaznidon River and 2 on the Urukh River in the Leskensky District of the K-B republic. Total power outpout estimates 45 MW. Projected for commission in 2012—2013. Other project of the Greta Energy includes the completion of 12 MHEPs with total power estimate 66,7 MW.
* MHEPs cascade on the Malka River includes the completion of for HEPs – Sarmakovskaya, Kamennomostskaya, Khabazskaya and Bolshoy Lakhran
with total power output of 96 MW. They are scheduled for completion in 2012–2015.
== External links ==

* (2007 OJSC RusHydro Annual Corporate Statement )


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Minor hydro-electric plants of Kabardino-Balkaria」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.